CO129-513-6 Hong Kong water supply- schemes for development and improvement 25-1-1929 - 2-8-1929 — Page 95

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

13.

89

Pipe Laying.

pipe a flexible ball and socket joint would be attached, the section finally being made watertight by means of blank flanges at each end.

After all the joints had been carefully protected by double wrapping, special slinging rings would be bloted

on to the pipe in the selected slinging positions, to

prevent damage to the pipe covering while laying was being

carried out.

Two laying lighters would emantime have been

prepared, each having two hand winches fixed approaching amidships, each winch carrying two wire ropes, thereby

giving four slinging points.

When a composite pipe has been lowered into the

water at the assembly yard a lighter would come alongside

the sea wall and take it over. The lighter would then be

towed into position and anchored over the line of anchor

blocks, ready for lowering the pipe to its allotted position

on the harbour bottom.

About half an hour before slack tide or earlier

if found possible the divers would go down and place rollers

on the harbour bottom along the proposed line and the pipe

would be lowered on to them, one end being brought as close

as possible to the end flange joint of the previous pipe laid. This should be comparatively easy, as the pipe being

empty would be light, only weighing 6 lbs. per foot run or

including a ball and socket joint about 1,900 lbs. in all.

The blank flange would then be removed, the pipe filling with water, and the joint would be pulled up tightly

by means of long screw bolts which would afterwards be

replaced by ordinary short jointing bolts. The lighter would then take the weight of the pipe and lift slightly,